十八禁不卡AV日韩国产AV大片,天天综合亚洲网桃色视频日韩无码,亚洲欧美日韩国产精品一区二区,深夜宅男国产欧日韩视频

sungo@sungofluid.com
0577-67378705 / 67378706

TECHNICAL SUPPORT

當前位置:首頁 >>

TECHNICAL SUPPORT

Shangzheng's product quality assurance system has the following ten quality control points:

1. Contract review

Contract review is a multi-faceted evaluation and review of business orders (contracts) to understand the user's requirements for products to the fullest extent. This user requirement is the main basis and criterion in the product design and production process. To ensure that the product meets user requirements.

2. Design control

Design control includes the control of product design and process.

On the premise of meeting user requirements, adopt good models, advanced and reliable structures, formulate complete quality plans, adopt advanced and accurate craftsmanship, and propose technical requirements and standards for manufacturing and testing. Ensure that product design meets user requirements and relevant technical standards; ensure that product manufacturing is conducted in accordance with standards, procedures and evidence.

3. Casting inspection

The casting inspection includes the composition test of the casting, the inspection of mechanical properties, the inspection of the appearance quality of the blank and the geometric quantity of the blank.

4. Semi-finished product inspection

Each process in the processing of semi-finished products must pass the inspection before being transferred to the next process. The first workpiece produced in batches in each process must undergo a special and comprehensive inspection to determine the qualification of its various quality characteristics and ensure the accuracy of the process; batch production is allowed after the inspection is qualified.

5. Assembly and matching inspection

The assembly and matching must be carried out in accordance with the technical requirements of the process regulations and user requirements. Assembly parts must be thoroughly cleaned and cleaned before partial assembly and final assembly. Each process must pass the inspection before proceeding to the next process operation.

6. Finished product inspection

Finished product inspection is divided into product performance inspection, factory inspection and other required tests.

Each new product (including newly designed and modified products) must undergo full performance testing (including strength, sealing, operating torque, opening, etc.), reliability test and life test. After all the tests are qualified and stabilized, the production will be finalized .

Factory inspection includes pressure test report data, switch torque record, painting quality, appearance quality and other inspection items required by users.

7. Inspection of outsourced parts, standard parts, and purchased parts

Standard parts and purchased parts are purchased in accordance with the standard requirements, and can be classified into the warehouse only after passing the inspection. The supplier must be reviewed by the sub-supplier, and the certificates, instructions and other materials must be complete.

Important items such as valve bodies, electric heads, etc. are purchased directly from the manufacturer or its commissioned agents (points), and the quality inspection department conducts a comprehensive inspection before purchasing in bulk to ensure the reliability of the items.

8. Inspection of tooling, fixtures, inspection tools, molds, and equipment

In order to ensure reliable production, molds, tooling, inspection tools, equipment, etc. must be inspected before being put into production.

9. Measurement

Conventional measuring tools and special inspection tools used in production for a long time are regularly inspected by the measuring room or sent to the measuring room from the tool room for inspection. Unqualified products can only be used after being repaired and qualified. To ensure the reliability of the measurement value transmission.

10. User service

The company's nationwide service network can provide customers with pre-sales and after-sales technical consultations.

The user service department regularly collects and sorts out the problems reported by users, conducts statistical analysis, and feeds them back to the production technology department, analyzes and resolves the main problems, and formulates effective measures to further improve product quality and form a virtuous circle of quality assurance.

Copyright ? 2014-2016 永嘉上正流體科技有限公司 All Rights Reserved. 浙ICP備14024553號-2 上正流體 浙公網安備 33032402001116號 網站地圖
關鍵詞:電磁閥|煤氣電磁閥|高溫電磁閥|不銹鋼電磁閥|磁翻柱液位計|電動閥門
主站蜘蛛池模板: 阿勒泰市| 大关县| 乌拉特前旗| 五华县| 锦州市| 眉山市| 东兴市| 陆丰市| 买车| 高台县| 武鸣县| 盘山县| 宁乡县| 通州市| 西乌| 新田县| 贵南县| 灵山县| 旬邑县| 项城市| 谢通门县| 高安市| 吉首市| 花垣县| 兖州市| 策勒县| 团风县| 梁河县| 固安县| 涟水县| 罗源县| 遂溪县| 五莲县| 东港市| 丰原市| 漠河县| 和林格尔县| 云龙县| 视频| 合作市| 桃园市|